THE GAPS, COSTED AND CLOSED.
We work alongside your contractors and suppliers. We survey, we audit, and we write down what is still outstanding. You keep the schedule either way.
Avoidable error costs about 5% of project value, roughly £5bn a year across UK construction. The top two causes are inadequate planning and late design changes. Source: Get It Right Initiative, A Call to Action.


CALL US BEFORE, DURING OR AFTER
THE JOB IS DIFFERENT EACH TIME.
Before: the specification is still soft, and we find what is missing before it is signed. During: something has slipped or been found, and we fill the trade nobody booked. After: the snag list is open and retention is held, and we close what was left.
FIVE STEPS, AND YOU CAN STOP AFTER THE SECOND.
STEPS IN TOTAL
5
STEPS AT NO COST
2
TEN GAPS.
EVERY ONE IS WHERE A REFURBISHMENT GOES WRONG.
Snagging and defects. RAAC. Accessibility. Fire doors. Back of house. Bedroom finishes. Corridors and public areas. Kitchens and extraction. External fabric. Contractor step-in. Two of them, RAAC and accessibility, carry a legal duty, and almost nobody sells them as a named hotel service.

HOTELS FIRST. THEN THE ROOMS INSIDE THEM THAT ARE HARDEST TO DO.
Hotels, from a single property to a managed estate. Then spa and wellness, restaurants and bars, heritage and listed buildings, and branded estates working to a PIP.